You may have to Search all our reviewed books and magazines, click the sign up button below to create a free account.
The Department of Energy (DOE) is engaged in numerous multimillion- and even multibillion-dollar projects that are one of a kind or first of a kind and require cutting-edge technology. The projects represent the diverse nature of DOE's missions, which encompass energy systems, nuclear weapons stewardship, environmental restoration, and basic research. Few other government or private organizations are challenged by projects of a similar magnitude, diversity, and complexity. To complete these complex projects on schedule, on budget, and in scope, the DOE needs highly developed project management capabilities. This report is an assessment of the status of project management in the Department of Energy as of mid-2001 and the progress DOE has made in this area since the National Research Council (NRC) report Improving Project Management in the Department of Energy (Phase II report) was published in June 1999.
In 1997, Congress, in the conference report, H.R. 105-271, to the FY1998 Energy and Water Development Appropriation Bill, directed the National Research Council (NRC) to carry out a series of assessments of project management at the Department of Energy (DOE). The final report in that series noted that DOE lacked an objective set of measures for assessing project management quality. The department set up a committee to develop performance measures and benchmarking procedures and asked the NRC for assistance in this effort. This report presents information and guidance for use as a first step toward development of a viable methodology to suit DOE's needs. It provides a number of possible performance measures, an analysis of the benchmarking process, and a description ways to implement the measures and benchmarking process.
The U.S. Department of Energy has been at the center of many of the greatest achievements in science and engineering in this century. DOE spends billions of dollars funding projects-and plans to keep on spending at this rate. But, documentation shows that DOE's construction and environmental remediation projects take much longer and cost 50% more than comparable projects undertaken by other federal agencies, calling into question DOE's procedures and project management. What are the root causes for these problems?
This is the 21st Volume in the series Memorial Tributes compiled by the National Academy of Engineering as a personal remembrance of the lives and outstanding achievements of its members and foreign associates. These volumes are intended to stand as an enduring record of the many contributions of engineers and engineering to the benefit of humankind. In most cases, the authors of the tributes are contemporaries or colleagues who had personal knowledge of the interests and the engineering accomplishments of the deceased. Through its members and foreign associates, the Academy carries out the responsibilities for which it was established in 1964. Under the charter of the National Academy of Sc...
In the more than 100 years since its formation, the U.S. Bureau of Reclamation of the Department of Interior (DOI), through its construction program, has brought water, electric power, and recreation facilities to millions of people in the Western United States. With major water and power systems in place, the Bureau's attention has now turned to operation, maintenance, repair, and modernization of those facilities in an environmentally and economically sound manner. To help with this effort, DOI asked the NRC to advise the Bureau on "appropriate organizational, management, and resource configurations to meet its construction, maintenance, and infrastructure requirements for its missions of the 21st century." This report presents an assessment of the requirements facing the Bureau in the 21st century, an analysis of good practices and techniques for addressing those challenges, and a review of workforce and human resource needs. The report also provides alternative scenarios that describe possible future organizations for infrastructure management.
None
In this study outsourcing is defined as the organizational practice of contracting for services from an external entity while retaining control over assets and oversight of the services being outsourced. In the 1980s, a number of factors led to a renewed interest in outsourcing. For private sector organizations, outsourcing was identified as a strategic component of business process reengineering-an effort to streamline an organization and increase its profitability. In the public sector, growing concern about the federal budget deficit, the continuing long-term fiscal crisis of some large cities, and other factors accelerated the use of privatization measures (including outsourcing for services) as a means of increasing the efficiency of government.
The Department of the Navy wants to improve shore installation operations, readiness, and management by skillfully leveraging state-of-the-market technologies and business methods such as outsourcing, privatization, and partnerships with state and local governments, with a goal of reduced cost of infrastructure. For the Navy itself, where all forces float or fly, the shore establishment is synonymous with infrastructure, which includes "all activities that provide sup port or control of forces from fixed bases of operation."