Progress has been made during the first year of full-scale development of the MX weapon system, particularly in missile development. However, the Department of Defense (DOD) is faced with a tremendous management challenge in achieving cost, schedule, and performance goals. Although DOD has approved new requirements estimated to cost $700 million, there has been no change in the life-cycle cost estimate. MX is designed to provide a certain number of surviving reentry vehicles assuming a threat constrained by the unratified Strategic Arms Limitation Treaty. Without a treaty, the Soviets could build enough weapons to neutralize MX. MX could then be expanded to counter that threat, at considerab...
None
None
Progress has been made during the first year of full-scale development of the MX weapon system, particularly in missile development. However, the Department of Defense (DOD) is faced with a tremendous management challenge in achieving cost, schedule, and performance goals. Although DOD has approved new requirements estimated to cost $700 million, there has been no change in the life-cycle cost estimate. MX is designed to provide a certain number of surviving reentry vehicles assuming a threat constrained by the unratified Strategic Arms Limitation Treaty. Without a treaty, the Soviets could build enough weapons to neutralize MX. MX could then be expanded to counter that threat, at considerab...
The MX Weapon System--A Program With Cost and Schedule Uncertainties
Status of the Peacekeeper (MX) Weapon System