You may have to Search all our reviewed books and magazines, click the sign up button below to create a free account.
None
Investigates AEC's justification of delayed opening and increased construction costs of La Crosse boiling water reactor (LACBWR) and similar difficulties experienced in construction of other nuclear power plants. Supplemental material (p. 55-536) includes evidence submitted by AEC concerning administrative procedures followed during development of safety and engineering standards.
pt.1: Considers S. 2880 and companion H.R. 14905, to authorize appropriations for AEC. Focuses on general budget and reactor development program; pt.2: Continuation of hearings on AEC FY69 authorization. Appendix includes reports. a. "National Accelerator Laboratory, Design Report 1968, Universities Research Associates, " prepared by AEC 1968 (p. 1223-1456). b. "Report of Ad Hoc Panel on Low-Beta Toroidal Plasma Research, " Sept. 1967 (p. 1459-1583). c. "Bronco Oil Shale Study, " prepared by AEC, Interior Dept, CER Geonuclear Corp., and Lawrence Radiation Laboratory, Oct. 13, 1967 (p. 1743-1813).