  • Publisher: Unknown

None

Report of the Joint Review Panel
  • Language: en
  • Pages: 457

Report of the Joint Review Panel

  • Type: Book
  • -
  • Published: 2014
  • -
  • Publisher: Unknown

None

Joint Review Panel Report
  • Language: en
  • Pages: 221

Joint Review Panel Report

The GSX Canada Pipeline Project is the Canadian portion of the Georgia Strait Crossing Project that involves construction and operation of a natural gas pipeline from Sumas, Wash. to Vancouver Island ...

Foundation for a Sustainable Northern Future
  • Language: en
  • Pages: 122

Foundation for a Sustainable Northern Future

  • Type: Book
  • -
  • Published: 2010
  • -
  • Publisher: Unknown

Subject to the full implementation of the Panel's recommendations, the Panel has concluded that the adverse impacts of the Mackenzie Gas Project and the Northwest Alberta Facilities would not likely be significant and that the Project and those Facilities would likely make a positive contribution towards sustainability. [...] The Panel would like to express its gratitude to the community field workers who travelled to various northern communities to The Panel would like to thank the Canadian Environmental explain the review process to everyone, and to the Aboriginal Assessment Agency, the Mackenzie Valley Environmental Impact interpreters who had the difficult task of simultaneously Review B...

Report of the Joint Review Panel
  • Language: en
  • Pages: 392

Report of the Joint Review Panel

  • Type: Book
  • -
  • Published: 2011
  • -
  • Publisher: Unknown

Nalcor Energy (Nalcor) proposed to develop two hydroelectric generation facilities, including construction of associated dams and reservoirs, on the lower Churchill River in central Labrador. The generation facilities would have a combined capacity of 3,074 megawatts (MW) with one facility located at Gull Island (2,250 MW) and one at Muskrat Falls (824 MW). The Project also included transmission lines between Muskrat Falls and Gull Island and between Gull Island and the existing Churchill Falls facility. Additional facilities associated with the Project would include access roads, temporary bridges, construction camps, borrow pits and quarry sites, diversion facilities and spoil areas. This ...