You may have to Search all our reviewed books and magazines, click the sign up button below to create a free account.
Nalcor Energy (Nalcor) proposed to develop two hydroelectric generation facilities, including construction of associated dams and reservoirs, on the lower Churchill River in central Labrador. The generation facilities would have a combined capacity of 3,074 megawatts (MW) with one facility located at Gull Island (2,250 MW) and one at Muskrat Falls (824 MW). The Project also included transmission lines between Muskrat Falls and Gull Island and between Gull Island and the existing Churchill Falls facility. Additional facilities associated with the Project would include access roads, temporary bridges, construction camps, borrow pits and quarry sites, diversion facilities and spoil areas. This ...
Nalcor Energy (Nalcor) proposed to develop two hydroelectric generation facilities, including construction of associated dams and reservoirs, on the lower Churchill River in central Labrador. The generation facilities would have a combined capacity of 3,074 megawatts (MW) with one facility located at Gull Island (2,250 MW) and one at Muskrat Falls (824 MW). The Project also included transmission lines between Muskrat Falls and Gull Island and between Gull Island and the existing Churchill Falls facility. Additional facilities associated with the Project would include access roads, temporary bridges, construction camps, borrow pits and quarry sites, diversion facilities and spoil areas. This ...
"This report results from a review by an Environmental Assessment Panel of a proposal to build power generating stations on the Lower Churchill River and associated transmission lines across Newfoundland and Labrador"--Exec. Summary.